UCKFIELD PATIO - MAY 2018
From Mid May 2018, we have been upgrading a previously old and tired looking patio area, to an extended, modern and sleek looking new porcelain patio. We had already previously ripped up the existing patio and prepared the area for laying. The patio also required a new brick wall along the far side to be built as well as having slabs cut and laid on top of the wall.. The job took 5 days to complete.